Recent work

A snapshot of what we build.

Every project is documented, tested and — where required — issued with a Certificate of Compliance.

5.5kW hybrid solarResidential Solar

5.5kW hybrid solar

Umhlanga Ridge

Grid-tied inverter with 10kWh battery backup. Full changeover so the home rides through load-shedding without a flicker.

DB board replacementResidential

DB board replacement

Kloof

1970s fuse board replaced with a modern 24-way DB, labelled circuits and earth leakage protection. Issued with a valid COC.

Three-phase machine wiringIndustrial

Three-phase machine wiring

Pinetown Industrial

New 3-phase supply, motor control panel and safety interlocks for a food processing line.

Restaurant LED redesignCommercial

Restaurant LED redesign

Ballito

Full LED downlight and track lighting design across 240m². Cut lighting load by 62% and improved ambience.

Pre-sale COC & remedialCompliance

Pre-sale COC & remedial

Durban North

Full property inspection, remedial work on 6 non-compliant items, and a valid COC issued within 48 hours.

After-hours fault repairEmergency

After-hours fault repair

Westville

Sparking DB traced to a failed neutral bar. Isolated, repaired and re-energised the same night.

Got a project in mind?

We'll come out, scope it honestly, and give you a written quote.

Request a quote
Call now WhatsApp